|
|
We
make the installation of your new monument sign quick and
easy. Our monuments are shipped with a schedule 40 pvc insert
already mounted inside the core. Once your sign arrives
all you need to do is prepare your site by digging 2 holes
(3 depending on the model). Then install your steel posts
into the pvc mounting sleeves using expanding foam adhesive,
making sure that you turn the steel posts while sliding
them into the sleeves. After that all you need to do is
level up the sign in the holes and fill with concrete. Back
fill any remaining dirt and you are finished.
|
|